continue our vision

Tulsa County

Tulsa County has a proposition on the April 5 ballot, seeking a renewal of 0.05 percent to pay for roads and levees, parks projects, and buildings/capital improvements.

The following comprehensive list of projects, totaling $75 million, was developed among direct requests from Tulsa County residents and with further evaluation from County staff and Tulsa County Commissioners. These four primary areas of focus include:

 

INFRASTRUCTURE IMPROVEMENTS     

Tulsa County maintains more than 700 miles of road and nearly 200 bridges. These major transportation thoroughfares are the backbone of neighborhoods, business and education areas. Within the Tulsa County limits, every municipality benefits from the capital investments made in the Tulsa County Maintenance Master Plan. Infrastructure improvements include dozens of miles of levees protecting vital homesteads and industrial areas along the Arkansas River. Improvements to these levee systems are critical to public safety.

$65 million
($55 million – County .05% Renewal Package/$10 million in Vision 2025 excess)

 

TULSA COUNTY PARKS IMPROVEMENTS

Tulsa County Parks are among the finest and largest parks in the Tulsa region. On average, the parks receive approximately 1.5 million times per year, and thus need capital improvements to meet an ever-growing demand. The County’s ability to service these visitors is hinged on having the capital dollars necessary to maintain and create public spaces that promote healthy lifestyles for children and adults.

$14 million
($10 million – County .05%/$4 million in Vision 2025 excess)

 

CAPITAL IMPROVEMENTS

The county has long struggled with antiquated space in buildings and enough parking to accommodate the thousands of people who use the court house. Solving these long-standing issues will allow the county to operate in a more efficient fashion and serve the public’s need for ease while navigating our facilities.

$14 million


Comprehensive List Projects

 

Infrastructure Improvements

District 3

121st St. So. Elwood to US Hwy 75 $7,100,000

Serves Jenks/Glenpool

Four-lane, curb and gutter with storm sewers. Intersection improvements at Elwood, including traffic signal installation. Replacement and widening of two deficient or load rated brides.

Average Daily Traffic – 2,000 – 6,000
Secondary Arterial – Good Condition

 

District 1

86th Street North – US Hwy 75 to Memorial Drive $7,475,000

Serves Owasso

Four-lane, curb and gutter with storm sewers. Intersection improvements at Memorial and Sheridan, including traffic signal installation or modification.

Average Daily Traffic – Over 10,000
Primary Arterial – Fair Condition

 

District 1

193rd E. Ave 31st St. So. to 51st St. So      $9,950,000

Serves Broken Arrow/Tulsa

Four-lanes curb and gutter with storm sewers. Intersection improvements at 31st and 41st, including traffic signal installation.

Average Daily Traffic – Over 10,000
Primary Arterial – Poor Condition

 

District 2

Wekiwa Road 129th W. Ave. to Shell Creek  $3,000,000

Serves Sand Springs

Reconstruct roadway with new base, as needed, new asphalt surfacing, wider shoulder and guard rail replacement. Possibly alter alignment and/or profile grade to enhance safety.

Average Daily Traffic – 1,000-2,000
Secondary Arterial – Very Bad Condition

 

District 2

Bridge on Edison East of 65th W. Ave.   $1,000,000

Serves Tulsa

Replace a 17 ton rated bridge with a structure capable of accommodating overweight, oversized loads that frequent this route. (Potential for a Creek Nation Tiger Grant)

Average Daily Traffic – 1,000–2,000
Secondary Arterial – Low Rated

 

District 2

41st St. So. 129th W. Ave. to 193rd W. Ave. $5,050,000

Serves Sand Springs

Four-lane, curb and gutter with storm sewer between 129th W. Ave. and 137th W. Ave. Reconstruct two lane roadway with new base and surfacing from 137th W. Ave. to 157th W. Ave., including intersection rebuild at 157th W. Ave. Mill and overlay from 157th W. Ave. to 193rd W. Ave.

Average Daily Traffic – 2,000-6,000
Primary Road – Bad Condition

 

District 1

51st St. So. 161st E. Ave. to 193rd E. Ave.   $7,725,000

Serves Broken Arrow/Tulsa

Four-lane, curb and gutter with storm sewers. Intersection improvements at 177th E. Ave. (Lynn Lane) and 193rd E. Ave. (County Line) including traffic signal modification.

Average Daily Traffic – Over 10,000
Secondary Arterial – Poor Condition

 

District 1

Bridge on 137th E. Ave. over Horsepen Creek  $4,100,000

Serves Collinsville

Replace structurally deficient bridge with approaches. Widen roadway to two lanes with wider shoulders.

Average Daily Traffic – 1,000-2,000
Secondary Arterial – Poor Condition

 

District 2

91st St. So. Elwood to US Hwy 75 $4,700,000

Serves Jenks/Tulsa

Three or four lane roadway with curb and gutter, storm sewer, and bridge replacement. Possible intersection improvements at Elwood with signal modification.

Average Daily Traffic – 2,000-6,000
Secondary Arterial – Good Condition
School Traffic causes congestion
Road crosses levee with undersized structure in creek

 

District 3

171st St. So. US 64 to 161st E. Ave.  $950,000

Serves Leonard/Bixby

Removal of the chip or asphalt surface, pulverizing or grinding the concrete pavement, applying an engineering fabric, relay the concrete pavement as a base with additional rock, as needed, and placing an asphalt surface on the roadway. Includes additional shoulder width and drainage improvements.

Average Daily Traffic – 0-1,000
Local Road in Very Bad Condition

 

District 2

Bridge on 209th W. Ave. No. of 61st St. So.  $750,000

Serves Sand Springs/County

Just north of 61st St. So. Replace a one lane bridge that has structural issues with a structure that has two lanes with adequate shoulders. School bus route.

Average Daily Traffic – 0-1,000
Secondary Arterial – Poor Condition

 

District 3

161st E. Ave. 171st St. So. to 181st St. So. $500,000

Serves Leonard/Bixby

Major base repair, asphalt leveling course and topping, shoulder widening and drainage improvements.

Average Daily Traffic – 0-1,000
Secondary Arterial – Very Bad Condition

 

District 3

Harvard 141st St. So. to 151st St. So. $3,600,000

Serves Bixby

Grade, drain and surface to four-lanes with a bridge replacement. Includes intersection improvements at 141st St. So.

Average Daily Traffic – 1,000-2,000
Secondary Arterial – Good Condition

 

District 1       

District 1 Maintenance Facility $3,000,000

Serves Tulsa County

Funds to assist with construction of new maintenance facility, including shop with offices, equipment sheds, site development, access roadway and offsite utility installation expenses.

 

District 3

District 3 Maintenance Facility $3,500,000

Serves Tulsa County

Funds to assist with construction of new maintenance facility, including shop with offices, equipment sheds, site development, access roadway and offsite utility installation expenses.

 

Levee Improvements

Tulsa County Drainage District 12 $5,000,000

Serves West Tulsa County Including Sand Springs and West Tulsa

Funds to assist with construction and improvements to a 22-mile levee system. City and Federal funds will also be used to for this project. Drainage District 12 protects property and assets valued at $2 Billion including two refineries, many businesses and thousands of homes.

 

TOTAL
$67,400,000


Tulsa County Parks Improvements 

LaFortune Park Improvements

Resurface and rebuild trail $1,400,000

Resurface and rebuild LaFortune Park Trail – one of the busiest walking/jogging trails in the state. Mud and washout problems occur from existing surface material creates challenges with varying elevations.

Replace perimeter fence  $250,000

Most of the parks fence is 40 plus years old and is damaged in several places. The fence also needs to be at least 6 feet tall.

Splash Pad   $550,000

Close and demolish existing pool, install a well-developed Splash Pad/Water play environment with repurposed water system will reduce overall park utility costs and irrigate portions of the picnic area, golf course fairways and outlying areas.

Replace existing Par 3 lights  $1,300,000

This is the only lighted Par 3 golf course in the State of Oklahoma. The original light poles were installed in 1970 and the light fixtures replacement parts are unavailable. Upgrading the lights will make them increasingly more energy efficient.

Renovate Par 3 golf course  $1,500,000

Originally built in 1960’s                                                              

Replace Existing Driving Range Lights  $250,000

The existing lights are 30 years old, with aging wooden poles and non-energy efficient light fixtures. Golf competition is highly competitive in the Metro area and the driving range is one of the last major improvements needed on the golf course complex.

Replace Exercise Court  $50,000

Existing exercise court was removed for safety reasons three years ago. The park users continually request that it be restored.

                                                                                                                                             

SUBTOTAL  $5,300,000

 

 

Chandler Park Improvements

New swimming pool (25 meter/6 lanes/bath house)   $3,150,000

The existing pool is 50 plus years old and is the only major attraction to the park. This pool serves the west side Tulsa County community.

Re-Develop Lower-Level Park $1,000,000 

The Master Plan for Chandler Park should be completed by year-end 2015. The Master Plan will guide us in determining the best use for that area of the park.

Replace existing ball field fencing (Park 5 field complex)   $200,000 

The return of youth baseball requires an upgrade to the facility to create a safer environment. The original fence was installed in 1984.

 

SUBTOTAL  $4,350,000

 

 

O’Brien Park Improvements

Renovate Exterior O’Brien Recreation Center   $700,000

The original center was built 48 years ago. In the late 1970’s an exterior spray on material was added to the original exterior, however, the building needs to be updated to enhance the improvements made to the park in the past 10 years.         

Renovate interior of O’Brien Park Recreation Center  $750,000

The interior finishes are also 48 years old and in dire need of updating to enhance the work done from the original Vision 2025 funds and 4 to Fix I and II funds.                         

Completely rebuild existing parking lot for Recreation Center  $300,000

The existing parking lot for the recreation center is sloped right at the east exterior outside wall of the facility. This causes water to seep into the rooms and the gym area of the center.

Splash Pad  $550,000

Replace the existing swimming pool with a well-designed Splash Pad/Water play environment with re-purposed water system that will reduce overall park utility costs and can irrigate portions of the park to enhance turf conditions for the baseball and football fields.

                                                                                                     

SUBTOTAL $2,300,000

 

 

Haikey Creek Park Improvements

Replace existing ball field fencing (softball complex)  $200,000

The original fencing for this complex was built in 1978. The fencing needs to be 6 feet tall minimum height.

                                                                                                    

SUBTOTAL  $200,000

 

 

South Lake Park Improvements

Replace existing pond liners at the golf course  $2,100,000

Existing liners are 27 years old, are damaged and leak extensively. We currently pump water from Pole Cat Creek into the ponds to maintain pond levels and irrigate golf course.                                     

Replace perimeter fence  $175,000

The existing fence is wood post and rail and is 27 years old. The fence rotting is a constant maintenance problem for the maintenance crew.

                                                                                                    

SUBTOTAL   $2,275,000

TOTAL FOR ALL PARKS PROJECTS  $14,425,000

 

 


County Capital Improvements 

Building /Parking Lot Purchase  $7 million

(Address space needs D.A.’s, Public Defender, Specialty Courts etc. as well as addressing growth Trends for Tulsa County offices)

Garage  $5 million

(Address parking needs for the growing number of users of the county courthouse)       

Information Technology  $5 million

Upgrade Infrastructure and prepare

For changes in technology.

Courthouse Improvements  $5 million

(Address structural/electrical/mechanical needs of the county courthouse and administration buildings)

Apache Building  $2 million

(expansion needed for records storage)

Social Services  $1 million

(Structural/electrical/facility upgrades needed)

 

TOTAL  $25 million

                                                                                                